ILAC p14:12/2010 - Accredited Calibration Certificate Uncertainty (2024)

M

merrick65

  • Dec 30, 2011
  • #1

I have a question in regards to ILAC P14:12/2010. I would like feedback/thoughts on the following sections :

4.1 Accreditation bodies that are full members of or are applicants to the ILAC Mutual Recognition Arrangement (the ILAC MRA) shall require their accredited calibration laboratories to estimate uncertainties of measurement for all calibrations and measurements covered by the scope of accreditation.

6.1 ISO/IEC 17025 requires calibration laboratories to report, in the calibration
certificate, the uncertainty of measurement and/or a statement of compliance with an
identified metrological specification or clauses thereof.

Accredited calibration laboratories shall report the uncertainty of measurement, in
compliance with the requirements in 6.2 – 6.5 of this section.

6.2 The measurement result shall normally include the measured quantity value y and the associated expanded uncertainty U. In calibration certificates the measurement result should be reported as y ± U associated with the units of y and U………

6.4 Contributions to the uncertainty stated on the calibration certificate shall include relevant short-term contributions during calibration and contributions that can reasonably be attributed to the customer’s device. Where applicable the uncertainty
shall cover the same contributions to uncertainty that were included in evaluation of the CMC uncertainty component, except that uncertainty components evaluated for the best existing device shall be replaced with those of the customer’s device.
Therefore, reported uncertainties tend to be larger than the uncertainty covered by the CMC. Random contributions that cannot be known by the laboratory, such as transport uncertainties, should normally be excluded in the uncertainty statement. If,
however, a laboratory anticipates that such contributions will have significant impact on the uncertainties attributed by the laboratory, the customer should be notified according to the general clauses regarding tenders and reviews of contracts in
ISO/IEC 17025.

6.5 As the definition of CMC implies, accredited calibration laboratories shall not report
a smaller uncertainty of measurement than the uncertainty of the CMC for which the
laboratory is accredited.

I take it to mean that all accredited calibration certificates will be required to have uncertainties calculated for each reading and displayed on the certificate. This does not include a general statement that lists the CMC. I would also think that each reading shall have at least 5 readings to deal with repeatabilty. I’m not sure how labs doing small dollar items calipers, micrometers, indicators will be able to calculate uncertainties for each individual calibration and still make money. I would like input from any assessors that are on here also.

I basically would like to know how the US accreditating bodies that are full members to the ILAC MRA are going to implement P14.

According to ILAC this policy shall be enforced as of Nov 2011.
ILAC P14 can be downloaded from ILAC. (broken link removed)

I hope this makes sense.

Last edited by a moderator:

ILAC p14:12/2010 - Accredited Calibration Certificate Uncertainty (1)

Elsmar Forum Sponsor

D

dgriffith

Quite Involved in Discussions
  • Dec 30, 2011
  • #2

merrick65 said:

....6.2 The measurement result shall normally include the measured quantity value y and the associated expanded uncertainty U. In calibration certificates the measurement result should be reported as y ± U associated with the units of y and U………

I take it to mean that all accredited calibration certificates will be required to have uncertainties calculated for each reading and displayed on the certificate. This does not include a general statement that lists the CMC. I would also think that each reading shall have at least 5 readings to deal with repeatabilty.

Each test point should have the associated uncertainty. The noise in the sample is part of the lab's budget and becomes part of the expanded uncertainty for that point. Best practices would dictate whether they use the std dev of the sample, or std dev of the mean.

Hershal

Metrologist-Auditor

Trusted Information Resource

  • Dec 30, 2011
  • #3

Merrick65, you are essentially correct regarding the uncertainty on accredited certs. However, ILAC has backed away from P14 just a bit and taken the position that the higher level Standard (ISO/IEC 17025:2005) is to be used until at least April 2012 when the P14 will supposedly be fixed one way or another. ISO/IEC 17025:2005 allows use of an accepted metrological specification which in the US means the Test Uncertainty Ratio (TUR) Rule, while P14 currently does not.

The US based ABs (all six) have all been requiring accredited certs to have uncertainty anyway. However, P14 requires uncertainty for each reading as you have pointed out.

My best guess is that this will lead to a dramatic increase in the non-logo certs (non-accredited), and likely also lead to higher charges for accredited cals here in the US. In a country where all labs must be accredited then P14 will likely have very little effect beyond the current situation.

Still, cross your fingers.

You must log in or register to reply here.

ILAC p14:12/2010 - Accredited Calibration Certificate Uncertainty (2024)

References

Top Articles
1608 Southeast 3rd Avenue, Grand Rapids, MN 55744 | Compass
430 NE 5th Ave, Grand Rapids, MN 55744 - MLS 6586243 - Coldwell Banker
Fighter Torso Ornament Kit
Nullreferenceexception 7 Days To Die
Cranes For Sale in United States| IronPlanet
Ron Martin Realty Cam
Knoxville Tennessee White Pages
Form V/Legends
Stadium Seats Near Me
Ymca Sammamish Class Schedule
Toyota Campers For Sale Craigslist
Recent Obituaries Patriot Ledger
Produzione mondiale di vino
Learn How to Use X (formerly Twitter) in 15 Minutes or Less
Waive Upgrade Fee
Gt Transfer Equivalency
Ree Marie Centerfold
OpenXR support for IL-2 and DCS for Windows Mixed Reality VR headsets
10 Best Places to Go and Things to Know for a Trip to the Hickory M...
Sand Castle Parents Guide
Jesus Calling Oct 27
Mile Split Fl
Swgoh Turn Meter Reduction Teams
Gentle Dental Northpointe
Ice Dodo Unblocked 76
E32 Ultipro Desktop Version
All Obituaries | Verkuilen-Van Deurzen Family Funeral Home | Little Chute WI funeral home and cremation
Chicago Based Pizza Chain Familiarly
Gma' Deals & Steals Today
Truck from Finland, used truck for sale from Finland
Guinness World Record For Longest Imessage
My Dog Ate A 5Mg Flexeril
Primerica Shareholder Account
+18886727547
Bee And Willow Bar Cart
How to Play the G Chord on Guitar: A Comprehensive Guide - Breakthrough Guitar | Online Guitar Lessons
拿到绿卡后一亩三分地
Craigslist Mount Pocono
Toonily The Carry
Empire Visionworks The Crossings Clifton Park Photos
Devotion Showtimes Near The Grand 16 - Pier Park
Trizzle Aarp
Indio Mall Eye Doctor
Gifford Christmas Craft Show 2022
Nsav Investorshub
Updates on removal of DePaul encampment | Press Releases | News | Newsroom
Pekin Soccer Tournament
Chase Bank Zip Code
56X40X25Cm
Smoke From Street Outlaws Net Worth
North Park Produce Poway Weekly Ad
Marion City Wide Garage Sale 2023
Latest Posts
Article information

Author: Terrell Hackett

Last Updated:

Views: 6409

Rating: 4.1 / 5 (72 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Terrell Hackett

Birthday: 1992-03-17

Address: Suite 453 459 Gibson Squares, East Adriane, AK 71925-5692

Phone: +21811810803470

Job: Chief Representative

Hobby: Board games, Rock climbing, Ghost hunting, Origami, Kabaddi, Mushroom hunting, Gaming

Introduction: My name is Terrell Hackett, I am a gleaming, brainy, courageous, helpful, healthy, cooperative, graceful person who loves writing and wants to share my knowledge and understanding with you.